TDS_Anniversary_Banner

Automation_Solution

 
Products By Products IPC & HMI

TDS_Banner_Building-Automation-System

What is BAS?

A BAS (Building Automation System-also called an energy management system-controls energy-consuming equipment in a building to reduce energy use while maintaining a comfortable environment. These systems which are present in more than half of all buildings in the U.S. larger than 100,000 square feet (ft2), include:

  • Building Automation System
  • Security Management System
  • Fire Alarm System
  • Carpark Management System

Advantages of integrated building automation

The integration phase already offers scope for utilizing synergy effects through building automation covering different functionalities. An occupancy sensor, for example, can be used in conjunction with lighting control, air-conditioning, facade control and alarm systems. As a result, the costs and complexity of the system can already be reduced considerably during the construction phase. Targeted application of sensors and actuators with due regard for their functionality offers numerous benefits for subsequent operation.

Reduction of field level equipment simplifies maintenance and eliminates sources of error. The resulting reduction of system failures and associated savings in service staff time lead to further cost optimization. The energy consumption of the whole building can be optimized through combination of different functionalities and logging of user behavior during occupied periods. On the engineering side benefit arise in terms of maintenance: While the complexity of the functionality increases, the overhead is significantly lower compared to the maintenance requirements for different systems.

Some of the most common strategies that BASs employ to cut energy use include:

Scheduling Scheduling turns equipment on or off at specific timing
Lockouts Lockouts ensure that equipment doesn’t turn on unless it’s necessary.

Resets

When equipment operates at greater capacity than necessary to meet building loads, it wastes energy. A BAS can ensure equipment operates at the minimum needed capacity by automatically resetting operating parameters to match current weather conditions.

Diagnostics Building operators who use a BAS to monitor information such as temperatures, flows, pressures, and actuator positions may use that data to determine whether equipment is operating incorrectly or inefficiently, and to troubleshoot problems. Some systems also use the data to automatically provide maintenance bulletins.


Why ask TDS Technology (S) Pte Ltd?

TDS offers wide range of hardware and software components for building automation based on industrial standards. This means high availability combined with long service life and maintenance-free operation is guaranteed for all components, so that safe operation is ensured 365 days a year. Individual components can be upgraded as required in order to ensure continuous operation of overall system.

For users integrated building automation offers enhanced comfort and convenience, for operators it offers good lettability with high return. Due to the modularity and the high degree of configurability of the automation system, extensions, modifications, upgrades and changes in building use can be accommodated without the need for major expansion or adaptation of the hardware and software.

With our experience in building automation system, we can provide the most suitable solution to suite your need.

Job Reference

BSH Bosch und Siemens Hausgeräte GmbH at “Aviva”, Munich, Germany
Project: building automation, including flexible single room control
Microsoft, Unterschleißheim near Munich, Germany
Project: USH2000 – The office of the future

KölnTriangle, Cologne, Germany
Project: intelligent room automation for high-rise building
Eurotheum (European Central Bank), Frankfurt, Germany
Project: building automation and building management

Tschuggen Bergoase, Arosa, Switzerland
Project: building control for complete lighting and blind control
Allianz head offi ce, Stuttgart, Germany
Project: refurbishment of the building automation and building management systems

Miele innovation centre for electronics development, Gütersloh, Germany
Project: building automation; blind and window control, lighting control
Philip Morris International, Lausanne, Switzerland
Project: building control for complete lighting, HVAC and blind control

Allianz Arena, Munich, Germany
Project: lighting system (including external lighting with colour change), malfunction logging and control of the low voltage switchgear in football arena
Dolder Grand Hotel, Zurich, Switzerland
Project: building control for complete lighting and HVAC control

Carré Theatre, Amsterdam, The Netherlands
Project: control of stage curtains and pulleys
Deutsches Museum, Munich, Germany
Project: building automation in the Verkehrszentrum branch

Scala di Milano, Milan, Italy
Project: refurbishment of the world-famous opera house, full automation of the stage equipment
CitizenM Hotel, Amsterdam, The Netherlands
Project: overall scheme for guest administration and hotel room automation

Ferry Porsche Congress Center, Zell am See, Austria
Project: lighting and shading control
Holiday Inn, Samara, Russia
Project: monitoring and control of supply systems

Zentrum Zukunft, Emstek, Germany
Project: building automation of the training and conference centre
F-eins, Vienna, Austria
Project: integrated automation of heating, ventilation, refrigeration, space cooling, energy management

Educational Institute, Singapore
Project: Monitoring and control for building facility
Educational Institute, Singapore
Project: Monitoring and control for building facility

Semiconductor, Singapore
Project: Monitoring and control for building facility with redundancy sytem
Semiconductor, Singapore
Project: Monitoring and control for building facility with redundancy sytem

Senkee Logistics Pte Ltd , Singapore
Project: D&B of Electrical Installation and ELV System
PIP , Singapore
Project: D&B of Electrical & Communication Infrastructure for 19 plots of customized factories units

C & P Land Pte Ltd , Singapore
Project: D&B of Electrical Installation, ELV & Structured Cabling Systems for a 8-Storey Single-User Light Industrial Development (Logistic HUB)

QiOptiq Singapore Pte Ltd , Singapore
Project: Design & Build of Electrical Installation, ELV & Structured Cabling Systems for A Block of 3-Storey Single-User Factory


Halliburton Far East Pte Ltd , Singapore
Project: Design & Build of Electrical Installation, ELV & Structured Cabling Systems for Erection of a 3-storey Single-User Industrial Development

BP-UMS Pte Ltd , Singapore
Project: Design & Build of Electrical Installation for a 2-storey Single-User Industrial Development


Sandvik (S.E.A.) Pte Ltd , Singapore
Project: Design & Build of Electrical Installation, ELV & Structured Cabling Systems for Erection of a 4-storey Single-User Light Industrial Development (Logistic HUB) with basement Carpark

UPS SCS (Singapore) Pte Ltd , Singapore
Project: Design & Build of Electrical Installation, ELV & Structured Cabling Systems for Erection of a 7-storey Single-User Light Industrial Development (Logistic HUB)


APC Distributors Pte Ltd , Singapore
Project: Design & Build of Electrical Installation of a 3-storey Single-User General Industrial Development (Logistic HUB)

C&P Holdings Pte Ltd , Singapore
Project: Design & Build of Electrical Installation, ELV systems to Mega Warehouse Development


Golden Spring Export Pte Ltd , Singapore
Project: Design & Build of Electrical Installation, ELV systems for a 3-storey Single-User General Industrial (Logistic) Development

United States Government Pacific Division (PACDIV) in Singapore , Singapore
Project: Renovation of Old Post Office for LSC Expansion


Turkish Embassy at SGX Centre , Singapore
Project: Addition and Alterations

Expeditors (S) Pte Ltd , Singapore
Project: Design & Build of Electrical Installation, ELV & Structured Cabling Systems for a 4-storey Single User Logistics HUB

Concourse Pool Club, Singapore
Project: Pool table lighting control and customer billing counter

Hewlett Packard, Tuas, Singapore
Project: Monitoring and control system for building facility, chillers, cooling tower, AHU, Power distribution

Semiconductor, Singapore
Project: Monitoring and control system for wafer fab facility

Hospital, Singapore
Project: Monitoring and control for patients' buzzer and lighting system

Commerical Building, Singapore
Project: Auto light, music and valve control with security system

Commercial Building, Malaysia
Project: Fire detection system

Educational Institute, Malaysia
Project: Campus power sub-station monitoring

 
   

Brands

BECKHOFF | GE | HAKKO | MITSUBISHI | MSA
WEST | HMS | KEB
ADV_New-Feature_TDS-Map
ADV_New_TDS-Product-Guide-Catalog-2013

TDS_ADV_Beckhoff_Embedded-PC_CX8000
featured stories