What is BAS?
A BAS (Building Automation System-also called an energy management system-controls energy-consuming equipment in a building to reduce energy use while maintaining a comfortable environment. These systems which are present in more than half of all buildings in the U.S. larger than 100,000 square feet (ft2), include:
- Building Automation System
- Security Management System
- Fire Alarm System
- Carpark Management System
Advantages of integrated building automation
The integration phase already offers scope for utilizing synergy effects through building automation covering different functionalities. An occupancy sensor, for example, can be used in conjunction with lighting control, air-conditioning, facade control and alarm systems. As a result, the costs and complexity of the system can already be reduced considerably during the construction phase. Targeted application of sensors and actuators with due regard for their functionality offers numerous benefits for subsequent operation.
Reduction of field level equipment simplifies maintenance and eliminates sources of error. The resulting reduction of system failures and associated savings in service staff time lead to further cost optimization. The energy consumption of the whole building can be optimized through combination of different functionalities and logging of user behavior during occupied periods. On the engineering side benefit arise in terms of maintenance: While the complexity of the functionality increases, the overhead is significantly lower compared to the maintenance requirements for different systems.
Some of the most common strategies that BASs employ to cut energy use include:
| Scheduling |
Scheduling turns equipment on or off at specific timing |
| Lockouts |
Lockouts ensure that equipment doesn’t turn on unless it’s necessary. |
Resets |
When equipment operates at greater capacity than necessary to meet building loads, it wastes energy. A BAS can ensure equipment operates at the minimum needed capacity by automatically resetting operating parameters to match current weather conditions.
|
| Diagnostics |
Building operators who use a BAS to monitor information such as temperatures, flows, pressures, and actuator positions may use that data to determine whether equipment is operating incorrectly or inefficiently, and to troubleshoot problems. Some systems also use the data to automatically provide maintenance bulletins. |
Why ask TDS Technology Pte Ltd?
TDS offers wide range of hardware and software components for building automation based on industrial standards. This means high availability combined with long service life and maintenance-free operation is guaranteed for all components, so that safe operation is ensured 365 days a year. Individual components can be upgraded as required in order to ensure continuous operation of overall system.
For users integrated building automation offers enhanced comfort and convenience, for operators it offers good lettability with high return. Due to the modularity and the high degree of configurability of the automation system, extensions, modifications, upgrades and changes in building use can be accommodated without the need for major expansion or adaptation of the hardware and software.
With our experience in building automation system, we can provide the most suitable solution to suite your need.
Job Reference
|
 |
|
 |
|
BSH Bosch und Siemens Hausgeräte GmbH at “Aviva”, Munich, Germany Project: building automation, including flexible single room control |
|
Microsoft, Unterschleißheim near Munich, Germany Project: USH2000 – The office of the future |
|
 |
|
 |
|
KölnTriangle, Cologne, Germany Project: intelligent room automation for high-rise building |
|
Eurotheum (European Central Bank), Frankfurt, Germany Project: building automation and building management |
|
 |
|
 |
|
Tschuggen Bergoase, Arosa, Switzerland Project: building control for complete lighting and blind control |
|
Allianz head offi ce, Stuttgart, Germany Project: refurbishment of the building automation and building management systems |
|
 |
|
 |
|
Miele innovation centre for electronics development, Gütersloh, Germany Project: building automation; blind and window control, lighting control |
|
Philip Morris International, Lausanne, Switzerland Project: building control for complete lighting, HVAC and blind control |
|
 |
|
 |
|
Allianz Arena, Munich, Germany Project: lighting system (including external lighting with colour change), malfunction logging and control of the low voltage switchgear in football arena |
|
Dolder Grand Hotel, Zurich, Switzerland Project: building control for complete lighting and HVAC control |
|
 |
|
 |
|
Carré Theatre, Amsterdam, The Netherlands Project: control of stage curtains and pulleys |
|
Deutsches Museum, Munich, Germany Project: building automation in the Verkehrszentrum branch |
|
 |
|
 |
|
Scala di Milano, Milan, Italy Project: refurbishment of the world-famous opera house, full automation of the stage equipment |
|
CitizenM Hotel, Amsterdam, The Netherlands Project: overall scheme for guest administration and hotel room automation |
|
 |
|
 |
|
Ferry Porsche Congress Center, Zell am See, Austria Project: lighting and shading control |
|
Holiday Inn, Samara, Russia Project: monitoring and control of supply systems |
|
 |
|
 |
|
Zentrum Zukunft, Emstek, Germany Project: building automation of the training and conference centre |
|
F-eins, Vienna, Austria Project: integrated automation of heating, ventilation, refrigeration, space cooling, energy management |
|
 |
|
 |
|
Educational Institute, Singapore Project: Monitoring and control for building facility |
|
Educational Institute, Singapore Project: Monitoring and control for building facility |
|
 |
|
 |
|
Semiconductor, Singapore Project: Monitoring and control for building facility with redundancy sytem |
|
Semiconductor, Singapore Project: Monitoring and control for building facility with redundancy sytem |
|
 |
|
 |
|
Senkee Logistics Pte Ltd , Singapore Project: D&B of Electrical Installation and ELV System |
|
PIP , Singapore Project: D&B of Electrical & Communication Infrastructure for 19 plots of customized factories units |
|
 |
|
 |
|
C & P Land Pte Ltd , Singapore Project: D&B of Electrical Installation, ELV & Structured Cabling Systems for a 8-Storey Single-User Light Industrial Development (Logistic HUB) |
|
QiOptiq Singapore Pte Ltd , Singapore Project: Design & Build of Electrical Installation, ELV & Structured Cabling Systems for A Block of 3-Storey Single-User Factory
|
|
 |
|
 |
|
Halliburton Far East Pte Ltd , Singapore Project: Design & Build of Electrical Installation, ELV & Structured Cabling Systems for Erection of a 3-storey Single-User Industrial Development |
|
BP-UMS Pte Ltd , Singapore Project: Design & Build of Electrical Installation for a 2-storey Single-User Industrial Development
|
|
-Pte-Ltd.gif) |
|
-Pte-Ltd.gif) |
|
Sandvik (S.E.A.) Pte Ltd , Singapore Project: Design & Build of Electrical Installation, ELV & Structured Cabling Systems for Erection of a 4-storey Single-User Light Industrial Development (Logistic HUB) with basement Carpark |
|
UPS SCS (Singapore) Pte Ltd , Singapore Project: Design & Build of Electrical Installation, ELV & Structured Cabling Systems for Erection of a 7-storey Single-User Light Industrial Development (Logistic HUB)
|
|
 |
|
 |
|
APC Distributors Pte Ltd , Singapore Project: Design & Build of Electrical Installation of a 3-storey Single-User General Industrial Development (Logistic HUB) |
|
C&P Holdings Pte Ltd , Singapore Project: Design & Build of Electrical Installation, ELV systems to Mega Warehouse Development
|
|
 |
|
 |
|
Golden Spring Export Pte Ltd , Singapore Project: Design & Build of Electrical Installation, ELV systems for a 3-storey Single-User General Industrial (Logistic) Development |
|
United States Government Pacific Division (PACDIV) in Singapore , Singapore Project: Renovation of Old Post Office for LSC Expansion
|
|
 |
|
-Pte-Ltd.gif) |
|
Turkish Embassy at SGX Centre , Singapore Project: Addition and Alterations |
|
Expeditors (S) Pte Ltd , Singapore Project: Design & Build of Electrical Installation, ELV & Structured Cabling Systems for a 4-storey Single User Logistics HUB
|
|
Concourse Pool Club, Singapore Project: Pool table lighting control and customer billing counter
Hewlett Packard, Tuas, Singapore Project: Monitoring and control system for building facility, chillers, cooling tower, AHU, Power distribution
Semiconductor, Singapore Project: Monitoring and control system for wafer fab facility
Hospital, Singapore Project: Monitoring and control for patients' buzzer and lighting system
Commerical Building, Singapore Project: Auto light, music and valve control with security system
Commercial Building, Malaysia Project: Fire detection system
Educational Institute, Malaysia Project: Campus power sub-station monitoring
|
|